Deck Railings and Stairs in Shawnee, KS
Guards at 36 inches, no opening a 4-inch sphere gets through, and posts anchored to take a 200-pound shove at the top rail.
Every Deck Service We Offer
Railing work pairs naturally with a re-deck, since the boards come off either way.

Deck Building
New decks from the pier up, drawn to the 2018 IRC Shawnee adopted.
Learn more →
Composite Decking
Capped composite and PVC boards, gapped the way the warranty requires.
Learn more →
Deck Repair
Rotted joists, spongy boards, and ledgers that were never bolted or flashed.
Learn more →
Deck Staining
Cleaned, brightened, dried to moisture, then finished in a dry window.
Learn more →
Deck Railings
Guards at 36 inches with no opening a 4-inch sphere can pass through.
Learn more →
Covered Decks
Pergolas, solid roofs, and screened porches on framing sized to carry them.
Learn more →What Makes a Guard Actually Hold
The rail is the part people see and the post connection is the part that fails. A guard that looks solid and moves when someone leans on it at height is one of the two classic deck injuries.
The 200-pound rule
A guard has to resist 200 pounds pushed horizontally at any point along the top rail.
Real post hardware
A notched 4x4 lag-screwed to the rim often cannot develop that load. Dedicated hold-downs exist for it.
The 4-inch sphere
No opening may pass a 4-inch sphere, which is roughly 3-7/8 inches of clear baluster spacing.
The gap underneath
The sphere rule applies below the bottom rail and between horizontal members too, not just between pickets.
Handrails on stairs
Four or more risers means a graspable handrail, mounted 34 to 38 inches above the nosing line.
Overhead clearance
Shawnee asks for 10 feet of vertical clearance to overhead electric within 3 feet horizontally.
How a Railing Job Runs
Four steps, and the frame gets checked before we anchor anything to it.
Call
Tell us the linear footage, the height above grade, and whether stairs are in scope. Those three set the price.
Check
We look at the rim joist and blocking, because that is what the guard posts have to anchor into.
Written Price
Priced by the foot, with stairs listed separately.
Install
Posts and hardware first, then rails, infill, and a hand check on every post.
Why Railings Cost More Than Shawnee Homeowners Expect
Because railing is priced by the linear foot of rail, not by the area of the deck, and a long, shallow deck can carry more rail than a big square one. Stairs make it worse: every flight, landing, and turn is expensive relative to the space it occupies, so the number of flights moves the price more than their width does. Then there is the system itself, where cable, glass, and aluminum sit well above wood. On older decks around here the guard posts are usually the real job, since notched 4x4 posts rarely develop the load the code wants. We build wood, metal, cable, and composite guards, plus stair rails, handrails, and full stair rebuilds.
- ✓ Wood, metal, or cable
- ✓ Code-height guards
- ✓ Proper post hardware
- ✓ Stair handrails
- ✓ Full stair rebuilds
- ✓ Priced by the foot
Guard and Stair Requirements
| Requirement | What the Code Asks For |
|---|---|
| Guard height | Minimum 36 inches from the walking surface or nosing line |
| Opening size | No opening may pass a 4-inch sphere, including under the bottom rail |
| Guard strength | 200 pounds concentrated, applied horizontally at any point on the top rail |
| Maximum riser | 7-3/4 inches |
| Minimum tread | 10 inches |
| Riser consistency | Largest and smallest riser in a flight within 3/8 inch of each other |
| Stair width | 36 inches clear, minimum |
| Handrail trigger | Any stairway with 4 or more risers |
| Handrail height | 34 to 38 inches above the tread nosing line, and graspable |
| Handrail material | A flat 2x4 is not accepted as a handrail here |
| Overhead electric | 10 feet of vertical clearance within 3 feet horizontally |
Before we leave, someone puts a shoulder into every guard post on your deck. Not a tap. If it moves, it is not finished, and I would rather find that out in front of you than have you find it out later with a drink in your hand.
Wood Guards vs Metal and Cable
| Wood Guard | Metal or Cable | |
|---|---|---|
| Upfront cost | The cheapest option | Premium, and it shows |
| Upkeep | Finish it or it silvers | Effectively none |
| View through it | Balusters block it | Thin verticals or cable |
| Repair | Replace one baluster | Usually a section at a time |
| Matching the deck | Stain to match anything | Color-matched to composite lines |
| Code path | Same 36 in and 4-in sphere rules | Same 36 in and 4-in sphere rules |
Deck Work Across Johnson County
We cover Shawnee first, then the rest of Johnson County: Lenexa, Overland Park, Merriam, Mission, Olathe, Prairie Village, Roeland Park, Lake Quivira, and De Soto. Bonner Springs, Edwardsville, and the Kansas City, KS side are in range too. Permit rules change at the city line, so we confirm which office your address answers to.
Railing Questions in Shawnee
Ready to Talk About Your Deck?
Call and tell us what you have in mind. We walk the site, take measurements, and put the number in writing before a single board is ordered.