
Composite Decking in Shawnee, KS
Capped composite and cellular PVC, gapped the way the warranty actually requires, over framing we check and tape before the first board goes down.
Every Deck Service We Offer
Composite work often starts as a re-deck and turns into railings too. Same crew for all of it.

Deck Building
New decks from the pier up, drawn to the 2018 IRC Shawnee adopted.
Learn more →
Composite Decking
Capped composite and PVC boards, gapped the way the warranty requires.
Learn more →
Deck Repair
Rotted joists, spongy boards, and ledgers that were never bolted or flashed.
Learn more →
Deck Staining
Cleaned, brightened, dried to moisture, then finished in a dry window.
Learn more →
Deck Railings
Guards at 36 inches with no opening a 4-inch sphere can pass through.
Learn more →
Covered Decks
Pergolas, solid roofs, and screened porches on framing sized to carry them.
Learn more →What Composite Work Involves Here
Boards are the easy part. The value is in the substructure underneath and in following the maker's instructions exactly, because those instructions are what the warranty is written against.
Joist tape underneath
Butyl along joist and beam tops, self-sealing around every fastener that goes through it.
Gaps set for heat
Composite expands. Side gaps run 1/8 to 3/16 inch, and 3/16 minimum where a board meets a post.
Board temperature checked
Over about 90 F a dark board is near full expansion, so the tighter end of the range applies.
Spacing to the layout
16 inches on center for most runs, tightened to 12 for diagonal and heavy-duty layouts.
One clip system, not three
Mixing brands of grooved board, clip, and screw creates both spacing and warranty problems.
An ICC-ES report behind it
Composite gets code recognition through ASTM D7032 testing. We use boards a building official can approve.
How a Composite Job Comes Together
Four steps, and the frame gets judged honestly before any new board is ordered.
Call
Tell us the deck size, the age, and whether you are replacing boards or starting over. We book a look.
Frame Check
We probe joists, posts, and the ledger with an awl. Sound framing can be re-decked. Soft framing cannot.
Board Choice
You pick the line and color, and the price goes in writing.
Install
Tape the frame, set the gaps, run the hidden fasteners, then trim, fascia, and a final clean.
What Kansas Summers Do to a Composite Deck
Composite moves with temperature, not with moisture, and that flips the installation rules that wood taught everyone. A dark board in a Shawnee July runs far hotter than the air does, so the gap gets set against the surface temperature of the board itself rather than the forecast. Boards laid too tight on a hot day buckle in the next heat wave; boards laid too loose on a cold morning leave gaps you can lose a phone through. We re-deck over sound framing, build new composite decks outright, and fit the matching railings, fascia, and stairs. Boards are the visible half of this job. What sits under them decides how long it lasts.
- ✓ Capped composite or PVC
- ✓ Hidden fastener systems
- ✓ Joist tape included
- ✓ Re-deck over sound framing
- ✓ Matching fascia and trim
- ✓ Manufacturer spec followed
Composite vs Treated Pine
| Pressure-Treated Pine | Capped Composite | |
|---|---|---|
| Stain and seal cycle | Clean and re-stain on a cycle | Never |
| Surface protection | Bare wood, no factory cap | Co-extruded polymer cap |
| Upfront cost | The cheapest decking to install | Costs more to install |
| Board movement | Wet boards shrink after install | Expands and contracts with heat |
| Code path | Prescriptive IRC span tables | ASTM D7032 and an ICC-ES report |
| Joist spacing | 16 in on center for most layouts | 12 in for diagonal layouts |
36-Inch Piers
Footings reach the depth Shawnee sets, below frost.
Flashed Ledgers
Metal over every ledger before decking covers it.
Taped Framing
Butyl along joist tops, where rot actually starts.
County Coverage
Shawnee, Lenexa, Overland Park, and the rest of Johnson County.
If your frame is sound, I will tell you so and re-deck it, because that saves you the price of a structure you already own. If it is not sound, I will show you the soft spot with an awl rather than ask you to take my word for it.
Deck Work Across Johnson County
We cover Shawnee first, then the rest of Johnson County: Lenexa, Overland Park, Merriam, Mission, Olathe, Prairie Village, Roeland Park, Lake Quivira, and De Soto. Bonner Springs, Edwardsville, and the Kansas City, KS side are in range too. Permit rules change at the city line, so we confirm which office your address answers to.
Composite Questions in Shawnee
Ready to Talk About Your Deck?
Call and tell us what you have in mind. We walk the site, take measurements, and put the number in writing before a single board is ordered.